Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month. Click here for info.



This website has been archived from TrainWeb.org/indcentral to TrainWeb.US/indcentral.

Construction & Layout - Summer / Fall 04


Benchwork

The benchwork consists of 1" x 4" pine boards supported by 2" x 2" legs. The top is 1/2" particle board. All connections are made with screws for easy modification if necessary in the future. Another approach I took was to build the layout in sections. Most of the sections are 2' x 4'. Some are larger - 3' x 6'. Each section is secured to the next with screws. This way, the layout can be disassembled and easily managed if it ever needs to be moved. The top is 42 1/2" from the floor.

Click on the thumbnails to enlarge them.


The first section is in place.
Another view.
It is finally taking shape.



Layout

The layout is starting to take shape. I am using Atlas Right Track software to get the general layout on paper. Next, I set the structures in place to get a feel for how it will look. I am using a pencil to sketch the track plan directly on the wood top. This really shows how it will all go together. If there is anything that I don't like, it is much easier to make a change at this stage.

The problem I ran into before was that I would lay track and set structures (based on the track plan) and then decide that I did not like it. A track plan on paper often does not capture the true feel of the layout. Now I am "test driving" the plan before I lay any roadbed and track.


Setting the buildings in place.
Close up.
Another "test" fit.


All images copyright © 2004 by CHD

This page copyright © 2004 by CHD


ad pos61 ad pos63
ad pos62 ad pos64



Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month. Click here for info.