|
|
|
|
|
Bush Terminal Yard looking South. |
|
NYCH Yard caboose. |
|
Bush Terminal yard, Northeastern exit to 1st Ave. |
|
Subway car unloading ramp (northeast portion of yard ). |
|
Yard looking Southeast. |
|
Heading South into yard from 1st Ave & 43rd Street. |
|
Engine House, Northwestern corner. |
|
A look in the engine house. |
|
Northwestern yard corner. |
|
Boxcar unloading ramp. |
|
Davidson Pipe storage area. |
|
Yard office caboose. |
|
Left track: building spur, Right track: yard entrance. |
|
New NYNJ Rail sign. |
|
Crews drill the yard. |
|
Drilling the yard with ex-UPY 1133. |
|
Remnants of Bush 1 floatbridge lead trackage. |
|
Bush 1 floatbridge, sunk. |
|
Bush 2 floatbridge. |
|
Bush 2 after rebuilding in 2007 |
|
Picking up an empty bulkhead flat from the yard. |
|
Between points switch stand. |
|
Extremely tight clearances on the way to Plywood Specialties. |
|
1133 pulls an empty boxcar out at Plywood Specialties. |
|
Plywood Specialties. |
|
Track into Plywood Specialties.
Note the chipped off gaurd rail. |
|
South down 1st Ave. |
|
The building where railcars have struck the corner. |
|
Other side of the building, 43rd st in foreground.. |
|
Detail of a single point turnout. |
|
East down 41st Street. |
|
Trackage cutting through the Bush Terminal warehouse. |
|
A Diamond at 41st Street & Second Ave. |
|
Trackage curving to get to Second Ave. |
|
Looking back West down 41st Street. |
|
Heading North to 39th Street Yard. |
|
Beginning of SBK trackage. |
|
The switch to get into 39th Street Yard. |
|
A Bush Terminal Warehouse. |
|
Looking back South down Second Ave. |
|
Left track was MVP warehousing, right track leads to Interdynamics. |
|
Track to Interdynamics. |