Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month. Click here for info.



This website has been archived from TrainWeb.org/AbandonedLIRR to TrainWeb.US/AbandonedLIRR.

Bush Terminal Yard looking South. NYCH Yard caboose.
Bush Terminal yard, Northeastern
exit to 1st Ave.
Subway car unloading ramp
(northeast portion of yard ).
Yard looking Southeast. Heading South into yard from 1st Ave
& 43rd Street.
Engine House, Northwestern corner. A look in the engine house.
Northwestern yard corner. Boxcar unloading ramp.
Davidson Pipe storage area. Yard office caboose.
Left track: building spur, Right track:
yard entrance.
New NYNJ Rail sign.
Crews drill the yard. Drilling the yard with ex-UPY 1133.
Remnants of Bush 1 floatbridge lead trackage. Bush 1 floatbridge, sunk.
Bush 2 floatbridge. Bush 2 after rebuilding in 2007
Picking up an empty bulkhead flat
from the yard.
Between points switch stand.
Extremely tight clearances on the way to
Plywood Specialties.
1133 pulls an empty boxcar out at Plywood Specialties.
Plywood Specialties. Track into Plywood Specialties.
Note the chipped off gaurd rail.
South down 1st Ave. The building where railcars
have struck the corner.
Other side of the building,
43rd st in foreground..
Detail of a single point turnout.
East down 41st Street. Trackage cutting through the
Bush Terminal warehouse.
A Diamond at 41st Street & Second Ave. Trackage curving to get to Second Ave.
Looking back West down 41st Street. Heading North to 39th Street Yard.
Beginning of SBK trackage. The switch to get into 39th Street Yard.
A Bush Terminal Warehouse. Looking back South down Second Ave.
Left track was MVP warehousing, right
track leads to Interdynamics.
Track to Interdynamics.
ad pos61 ad pos63
ad pos62 ad pos64



Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month. Click here for info.