Mexico Albany BC Rail Brooklyn Cabinet Detail Crane Day Assembly Other

Delaware and Hudson Railway
Doyle McCormack's Restoration Project
Galleries Images Notes
Mexico 32

The project began in Mexico, with the repatriation of D&H #16 and #18

Albany 23

The locomotives were moved to the yards in Albany, OR, where they were put on their trucks...

BC Rail 10

Wrecked BC Rail units were acquired for parts...

Brooklyn 23

Once on its trucks, the future NKP190 moved to Brooklyn Yard in Portland for restoration...

Electrical Cabinet 15 In late 2002 the electrical cabinet was installed...
Detail 28 Detail shots of control stand & electrical cabinet from early 2003...
Crane Day 24 On July 17, 2003, a crane was hired to lift the prime mover out of the B-unit and into the PA...
Assembly 8 The end of 2003 saw the beginning of the "assembly" process, which continues into 2004...
Other 12 More images from Doyle's restoration project

For up-to-date images and information see:  http://nkp190.com  THANKS Doyle!!!!!!!

Created:
January 22, 2000
Last Updated:
December 26, 2006
FrontPage Logo

click here to visit
Delaware and Hudson SiteRing The Delaware and Hudson SiteRing
SiteRing by Bravenet.com
Previous Site List Sites Random Site Join Ring Next Site
Site Hosted by:  

Visitors:  

This site contains Copyrighted © material thus reproductions, alterations, etc. are prohibited without permission of the Photographer as document throughout this site

ad pos61 ad pos63
ad pos62 ad pos64



Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month. Click here for info.