Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month. Click here for info.



This website has been archived from TrainWeb.org/dsrg to TrainWeb.US/dsrg.

Bear Flatt
Is
a water stop at the bottom of Bear Mountain.
The
tank was placed here so crews could top off
the tenders with water, to make sure they could
get to the logging camp at Rattler Gap
I built Bear Flatt  in April, of 1999. Adding 2
scratch built stub switches, track, a water tank,
a pile of new ties, some 55 gal. barrels that hold
grease & oil,  and a bear.
Other detail will be added as I see fit.
 
Photo     #1
Photo     #2
Photo     #3
Photo     #4
Photo     #5
Photo     #6
Photo     #7
Photo     #8
Photo     #9
Photo   #10
Photo   #11
As of 12 March 2001, I have rebuilt the area
making the siding longer, and moving the water
tank and windmill to a better spot.
Photo  #12
Photo  #13
Photo  #14
Photo  #15
Photo  #16
Photo  #17
Photo  #18
 Switching Yard 
16 March 2001
ad pos61 ad pos63
ad pos62 ad pos64



Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month. Click here for info.