Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month.
Click here for info.
HOME
.COM
.ORG
.US
.NET
FORUM
TRAVEL
RAILFANS
MODEL RR
Latest Reports
Featured Today
FREE e-Newsletter
Slideshows
The Big Stories
Directory
This website has been archived from TrainWeb.org/dsrg to TrainWeb.US/dsrg.
The Culvert at
Bear Mountain
T
o Build this Culvert, I gathered some
small rocks about 1/2 to 3/4 inch in size.
I then used "Goop" to make a rock wall
about 4 scale feet high. In the middle of this
wall, I put a 5/8 inch x 6 inches, brass tube.
This will be a drain for water along the tracks.
I then installed the culvert and ran a drip line
down to the pipe. The drip line was buried so
to hide where the water came from.
~~~
Photo
# 1
Photo
# 2
Photo
# 3
Switching Yard
Built 12 June 1999
HOME
.COM
.ORG
.US
.NET
FORUM
TRAVEL
RAILFANS
MODEL RR
Latest Reports
Featured Today
FREE e-Newsletter
Slideshows
The Big Stories
Directory
Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month.
Click here for info.