This website has been archived from TrainWeb.org/embeemrr to TrainWeb.US/embeemrr.
For the most part, the benchwork for the Upper Level is in place along with the backdrops.
For the time being, a temporaty piece off track will bypass the penicula part of the layout to allow for operations on the Upper Level.
The Upper Level has been completely pre-wired for track and detection, and for turnouts.