The lowerlevel staging for my loops and bypasses have become hidden with the additon of the airport (which was planed) I built the airport runway on a single 8'by 8" plywood that lifts off whenever there is a need to access the hidden tracks. Each end tunnel is accessible! East end from the side and back and the west end by lifting up entire zoo. Piece of cake.!!Back to home page...