Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month. Click here for info.



This website has been archived from TrainWeb.org/ironbelt to TrainWeb.US/ironbelt.

Ore Bridge Model

Back to Ore Bridge Home Page     Back to Projects Folder

 

Details Added

(It's all over but the paintin')

 

It's been a long, hot summer, with precious little time available to work on the ore bridge. When I was almost ready to add the gusset plates, I examined some photos more closely and concluded that my span was too screwed-up to be usable. So I made the painful decision to build an entirely new span and extension - I gave it the codename "OB2." This delayed my project another two months, but I believe the results were worth the trouble. Luckily it's nearly completed, and I have the photos to prove it.

 

This thing is absolute hell to photograph, though - I couldn't gather enough blue posterboard to hide the background clutter when trying to get all-inclusive shots! Oh well...

 

Here is a right-front 3/4 view of the bridge, including the forward tunnel frame.

A head-on view...

A left side, all-inclusive view...

Close-up of the left rear, with tram parked at access platform.

A left-front 3/4 view with the extension span raised.

 

Now comes the hard part: PAINTING! (i.e., not the actual painting itself, but the preliminary cleaning and prep work.)

 

Maybe I'll see you in Malvern on September 24...

-KJL

 

Back to Ore Bridge Home Page     Back to Projects Folder

.

ad pos61 ad pos63
ad pos62 ad pos64



Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month. Click here for info.