This website has been archived from TrainWeb.org/ironbelt to TrainWeb.US/ironbelt.
Back to Ore Bridge Home Page Back to Projects Folder
(It's all over but the paintin')
It's been a long, hot summer, with precious little time available to work on the ore bridge. When I was almost ready to add the gusset plates, I examined some photos more closely and concluded that my span was too screwed-up to be usable. So I made the painful decision to build an entirely new span and extension - I gave it the codename "OB2." This delayed my project another two months, but I believe the results were worth the trouble. Luckily it's nearly completed, and I have the photos to prove it.
This thing is absolute hell to photograph, though - I couldn't gather enough blue posterboard to hide the background clutter when trying to get all-inclusive shots! Oh well...
Here is a right-front 3/4 view of the bridge, including the forward tunnel frame. |
A head-on view... |
A left side, all-inclusive view... |
Close-up of the left rear, with tram parked at access platform. |
A left-front 3/4 view with the extension span raised. |
Now comes the hard part: PAINTING! (i.e., not the actual painting itself, but the preliminary cleaning and prep work.)
Maybe I'll see you in Malvern on September 24...
-KJL
Back to Ore Bridge Home Page Back to Projects Folder
.