Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month. Click here for info.



This website has been archived from TrainWeb.org/jfuhrtrain to TrainWeb.US/jfuhrtrain.

Subj: RE: F7 Phase Chart
Date: 7/18/2001 1:19:56 PM Pacific Daylight Time
From:    John.Thompson@PSS.Boeing.com (Thompson, John A)
To:    JFuhrtrain@aol.com ('JFuhrtrain@aol.com')


Jim,

I'm running out of time to get your nice chart included in my handout.  The F7 chart looks fine, and I'll send notes in this message in case you can make a similar F3 chart (real quick today) that could go the back side of the same handout page.  If we're out of time, it will be a resource on the Web instead.

All these phase changes come from Ed Hawkins, by the way, so he should get credit too.

July 46 - Ist F2's - (same as F3 phase 1 body but with FT electrical system)
        - has chiken wire in grille area, short rear vent in grille area, 3 portholes, small FT number boards, 4 highhfans on roof, 2 rectangular DB openings on roof

Dec 46 - last F2's produced

Nov- 46 - begin F3 Phase 1 - looks same as F2 but with new electrical system

Dec 46 - change from small to large number boards on roof (with few exceptions)
[ATSF 16-21 fit here, as delivered in Nov 46]

Feb-May 47 - begin F3 Phase 2 Early - change from 3 portholes (on A unit) to chicken wire over 4 openings between 2 portholes, change from short to long rear vent in grille area (still with chicken wire)

[ATSF 16-21 were changed to this phase in 1948, lasted into 1952]

Dec 47/Apr 48 - begin F3 Phase 2 Late - change from high fans to normal fans

Mar-Jun 48 - begin F3 Phase 3 - remove chicken wire from between portholes, cover openings with 4 horizontal louvers

[ATSF 22-30 fit here, as delivered in Mar-Jun-Sep 48] [yes, 30 was definitely Phase 3, not Phase 4!!]

Aug-Nov 48 - begin F3 Phase 4 ("F5") - remove chicken wire from grille area and add horizontal grille

[ATSF 31-36 fit here, as delivered in Oct 48 - Jan 49]
[ATSF 200-201 also fit here, as delivered in Oct-Nov 48]

Feb 49 - last F3's produced

[1951/52 - add vertical grilles to 22-30, and to 31-36]

[1952 - add horizontal (?) grille and horizontal louvers to ATSF 16-21]

[1953? - change to vertical grille and vertical louvers on ATSF 16-21]

[note - ATSF 16-21 had long warbonnet and silver paint, 22-36 had short warbonnet and stainless steel panels]

If you can somehow send me a chart of this by the end of today, I'll try to include it.

Thanks,
John

ad pos61 ad pos63
ad pos62 ad pos64



Support this website by joining the Silver Rails TrainWeb Club for as little as $1 per month. Click here for info.