This website has been archived from TrainWeb.org/mcdonnell to TrainWeb.US/mcdonnell.
|
|
||
When I looked inside the windows, I figured that there was easily over $1000 worth of catenary installed. The layout was also run using the EPL system for switching, not the MTS.
|
|||