This website has been archived from TrainWeb.org/railblazer to TrainWeb.US/railblazer.
TRAIN #187 BETWEEN LEYDEN AND ROCKY AT SUNRISE. 3-90
5504 IN THE SIDING AT PLAIN TO MEET THE SKI TRAIN. 3-91
5380 ON THE POINT OF THE SKI TRAIN AT PLAIN. 3-91
3098 EASTBOUND AT PLAIN WITH COAL FOR PUBLIC SERVICE. 3-91
5517 WESTBOUND BETWEEN DELL AND RANGE ON THE DOTSERO CUTOFF. 6-91
TRAIN #187 WESTBOUND TUNNEL 29 1-92
DVOAF MEETS AICLC AT EAST PORTAL. NOTICE THE TWO UNITS ON THE POINT OF COAL LOAD. 6-92
5316 AND ANOTHER SD45 EAST BOUND AT ROLLINS WITH #708
6-92
5321 AT EAST CLIFF 6-92
3065 WESTBOUND AT CLIFF 6-92
5360 EASTBOUND AT ROLLINS 7-92
COLETO CREEK TRAIN #708 EASTBOUND OUT OF CLIFF. THIS WAS A JOINT DRGW/BN TRAIN THAT USED POOLED POWER. 8-92
5372 WESTBOUND AT CRESCENT WITH A COLORADO SPRINGS COAL EMPTY 12-92
5372 AGAIN JUST WEST OF CLIFF 12-92
5403 IN THE HOLE AT LEYDEN 5-93
5376 SWING HELP AT LEYDEN 5-93
5412 SWING HELP EAST PORTAL 8-93
5347 WITH A 3 UNIT REAR HELP EAST PORTAL 8-93
REAR HELP OF A PUBLIC SERVICE COAL LOAD EAST PORTAL 8-93
SP'S TELECOM TRAIN WORKING BETWEEN TOLLAND AND EAST PORTAL 8-93
THIS IS A MACHINE THAT DIGS A TRENCH TO BURY THE FIBER OPTICS 8-93
ONE OF THE GONDOLAS TO HAUL SPOOLS OF FIBER OPTICS 8-93
EASTBOUND COAL LOAD AT EAST PORTAL LOOKING FROM THE OLD ROLLINS PASS ROAD 8-93
5347 EAST PORTAL 8-93
WESTBOUND AT TOLLAND FROM THE ROLLINS PASS ROAD 8-93
ENTERING MOFFAT TUNNEL WITH SKI AREA IN BACKGROUND 9-93
EXITING MOFFAT 9-93
|